Day 176:
We can label this week a week of activities behind closed doors. Monday, they stained our wood floors and so locked doors were applied for several days. Meanwhile, little activity transpired.
Thus another meeting with the contractor was held behind closed doors where we discussed additional pricing and the lack of performance. I think that our contractor was a bit disappointed in the lack of performance also once he had inspected what has been accomplished in the past two weeks, while he was laid up with hip surgery.
Friday, tile contractor floated the floors for the tile, of course no pictures to share due to locked doors. Saturday, our grading contractor showed up and graded out the driveway and walkway. Next week, I hope to have driveway/walkway installed, stone work started, tile completed and paint preps in the works.